{"id":53,"date":"2010-12-01T16:02:58","date_gmt":"2010-12-01T16:02:58","guid":{"rendered":"http:\/\/mvs102-004.directrouter.co.uk\/~collplac\/?page_id=53"},"modified":"2013-05-29T23:07:51","modified_gmt":"2013-05-29T23:07:51","slug":"physical-demolition-blowdown","status":"publish","type":"page","link":"https:\/\/stnicholasdemolition.co.uk\/?page_id=53","title":{"rendered":"Physical Demolition"},"content":{"rendered":"<p>St. Nicholas House will be deconstructed on a floor-by-floor basis.<\/p>\n<p>Scaffolding will be erected around the whole building<\/p>\n<div id=\"attachment_246\" style=\"width: 330px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/stnicholasdemolition.co.uk\/wp-content\/uploads\/2010\/12\/Small-Robotic-Breaker-.jpg\"><img aria-describedby=\"caption-attachment-246\" loading=\"lazy\" class=\"size-medium wp-image-246 \" title=\"Small Robotic Breaker\" alt=\"Small Robotic Breaker\" src=\"http:\/\/stnicholasdemolition.co.uk\/wp-content\/uploads\/2010\/12\/Small-Robotic-Breaker--320x165.jpg\" width=\"320\" height=\"165\" srcset=\"https:\/\/stnicholasdemolition.co.uk\/wp-content\/uploads\/2010\/12\/Small-Robotic-Breaker--320x165.jpg 320w, https:\/\/stnicholasdemolition.co.uk\/wp-content\/uploads\/2010\/12\/Small-Robotic-Breaker-.jpg 640w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/a><p id=\"caption-attachment-246\" class=\"wp-caption-text\">Small Robotic Breaker<\/p><\/div>\n<p>Small robotic breakers will be used to deconstruct walls, floors, beams and columns in sequence.<\/p>\n<p>These small robotic breakers are worked remotely, rather than operators sitting in a cab.<\/p>\n<p>This process will see the building brought down from 14-storeys to a height at which we can safely switch to conventional machine demolition<\/p>\n<p>Approximately 8,000 tonnes of material will be taken out in this phase of the de-construction, which is due to be complete in Spring 2014.<\/p>\n<p>The rest of the buildings will be demolished by specialist demolition machines.<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>St. Nicholas House will be deconstructed on a floor-by-floor basis. Scaffolding will be erected around the whole building Small robotic breakers will be used to deconstruct walls, floors, beams and columns in sequence. These small robotic breakers are worked remotely, &hellip; <a href=\"https:\/\/stnicholasdemolition.co.uk\/?page_id=53\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"parent":22,"menu_order":4,"comment_status":"closed","ping_status":"open","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/stnicholasdemolition.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/53"}],"collection":[{"href":"https:\/\/stnicholasdemolition.co.uk\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/stnicholasdemolition.co.uk\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/stnicholasdemolition.co.uk\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stnicholasdemolition.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=53"}],"version-history":[{"count":3,"href":"https:\/\/stnicholasdemolition.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/53\/revisions"}],"predecessor-version":[{"id":222,"href":"https:\/\/stnicholasdemolition.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/53\/revisions\/222"}],"up":[{"embeddable":true,"href":"https:\/\/stnicholasdemolition.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/22"}],"wp:attachment":[{"href":"https:\/\/stnicholasdemolition.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=53"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}